Hand Operated Plain Brick Machine

Technical Specifications

Weight160kg (approx)
Rate of Production50 plain bricks per hour
Crew3 unskilled labour
Power consumptionNil (It's a Manual machine)
Manufacturing time10 days from placement of supply order
Erection and commissionNot required
Training1 day

Do's & Don'ts

1. Clean mould box daily after use.
2. Check height of the brick during the starting of the shift and periodically thereafter.
3. Check all nuts and bolts of the Arm daily.
4. DO NOT leave any material inside the mould box before closing down for the day.

Semi Automatic Plain Brick Machine

 

Technical Specifications

Weight1 Ton (approx)
Rate of Production250 plain bricks per hour
Crew1 Semi Skilled & 5 unskilled labour
Power consumption5 KW per hour (maximum)
Manufacturing time30 days from placement of supply order
Erection and commission1 day
Training1 day
Mixing MachineBrick Press
a. Capacity – 150 litresa. Single cylinder Hydraulic power pack of 100ltr with 5 HP 4 Pole ABB motor
b. RPM: 30b. Steel Mould Box with two moulds
c. Motor: 3 HP 4 Pole ABB Motor with Starter
d. Gear Box: 3” FV 20:1 ELECON / SHANTHI

Accessories

1. Interlocking bricks of size 300mm x 150mm x 100mm.

2. Interlocking bricks of size 300mm x 100mm x 100mm.

Automatic Plain Brick Machine

Technical Specification

Weight3 Tons(approx)
Rate of Production1000-1200 bricks per hour
Crew1 semi skilled & 7 unskilled labour
Power consumption30 KW per hour (maximum)
Manufacturing time45 days from placement of supply order
Erection and commission2 days
Training3 days

Components:

Mixing MachineBrick Press
a. capacity – 600litresa. Double cylinder Hyrdraulic power pack of 100 ltr with 15HP 4 Pole ABB motor.
b. RPM – 30b. PLC controlled circuit. No human intervention upto ejection stage.
c. Motor – 20 HP 4 Pole ABB motor
d. Gear Box – 8” FV 40:1 ELECON / SHANTHI

Do's & Dont's

Mixing MachineBrick Press
a. Do not start the mixing machine in full loada. Do not open the control panel without presence of competent person.
b. Incase of a power failure remove 75% of the material before restarting.b. PLC shall be handled only by company representatives.
c. Clean the arms and the pan daily after use.c. Area around the hydraulic valve should be kept clean at all times.
d. Gear Oil level to be monitored once a weekd. Clean mould box daily after use.
e. Do not start the power pack motor before filling the oil (hydraulic oil system 68) to 85% of its capacity.